8.
Work by firm or joint-venture members, which best illustrates current
qualifications relevant to this project
(list not more than 10 projects). |
|||||||||
|
|
|
|
d. Completion |
e.
Estimated Cost |
(In Thousands) |
||||
|
a.
Project Name & Location |
b. Nature of Firm’s Responsibility |
c. Project Owner’s Name & Address and
Project Manager’s Name & Phone Number |
Date (actual or estimated) |
Entire Project |
Work for Which Firm Was / Is Responsible |
||||
|
Old Re-alignment
and Reconstruction |
Prime Consultant (See Below) |
Val Keene, Secretary Ph. 717-786-2877 |
2007 |
200 |
22 |
||||
|
|
|||||||||
|
|
The Old Dam Road Reconstruction
was designed under a The project included a section within the floodplain where the profile was raised and another part of the project was adjacent to wetlands and involved property acquisition from a local farmer. The road was designed per PennDOT and AASHTO standards. Construction is scheduled for completion in 2007. Wilson Consulting Group (WCG) was the prime consultant on this project: WCG completed the following tasks; · Drainage Design · Hydraulic analysis using HEC-RAS · GP-11 for floodplain encroachment · Wetland Delineation and Bog turtle survey · Roadway Plans · E&SC Plans and LCCD Coordination · Construction Consultation
|
Before |
|
|
|||||
|
After |
|||||||||
|
STANDARD
FORM 255 PAGE 9 (REV.
11-92) |
|||||||||