8.  Work by firm or joint-venture members which best illustrates current qualifications relevant to this project  (list not more than 10 projects).

 

 

 

d.  Completion

e.  Estimated Cost

 (In Thousands)

 

a.  Project Name & Location

b.  Nature of Firm’s

     Responsibility

c.  Project Owner’s Name & Address

     and Project Manager’s Name &

     Phone Number

     Date

     (actual or

      estimated)

 

        Entire

        Project

Work for Which

Firm Was / Is

Responsible

 

T-369 over Tunungwant Creek

Foster Township

McKean County, PA

 

Sub-Consultant

(See Below)

Foster Township Supervisors

Sub to

E&M Engineers and Surveyors, Inc.

24 Derrick Road

Bradford, PA 16701

Roy Pederson Ph 814-362-5546

 

actual

2005 design

*******

2007 constr.

estimated

2,000

125

 

 

 

Tuna Cross Road Bridge

Replacement

 

Bridge replacement using Federal Funds, administered by PennDOT Engineering District 2-0

 

Wilson Consulting is retained to perform the following services:

 

  • Hydraulic Study – ACOE Flood Control Channel (HEC-RAS)

 

  • DEP Chapter 105 Joint Permit Application

 

  • Preliminary Design (TS&L)

 

  • Foundation Submission

 

  • Final Design/Plans (LRFD)

 

  • Construction Consultation

 

 

 

 

 